JBP/WS/01 : Phase I: Supply
& installation of bulk meters & bulk consumer mtrs.
JBP/WS/02 : Rehabilitation
of WTP's at Bhongadwar & Ranjihi.
JBP/WS/03 : Rehabilitation
of Katiyaghat PS, Ranjhi PS at and RWPS at Fagua.
JBP/WS/04 : Phase I:
Rectifications at Pariyat Dam: overflow and intake.
JBP/WS/06 : Leak repairs,
valve & service line repairs , Rectification of pump & gravity mains,
including replacement of pipeline from Khandari Dam to Bhongadwar WTP.
JBP/WS/07 : Supply, laying
and testing of new DI mains and service connections at Medical and
Poli Pather tanks.
JBP/WS/08 : Phase II: Supply
& installation of non-domestic consumer meters (2000) and bulk
meters(25).
JBP/WS/09 : New pipe lines
for distribution system (South zone).
JBP/WS/10 : New pipe lines
for distribution system (North zone, part I).
JBP/WS/11 : New pipe lines
for distribution system (North zone, part II).
JBP/WS/12 : Construction
OHSR, Sumps& Pump Hs. Lot-I, Construction OHSR, Sumps& Pump Hs. Lot-II.
JBP/WS/13 :UFW Pilot Area
for leak detection.
JBP/WS/14 :Phase III: Supply
& installation of domestic consumer meters (1,55,200).
JBP/WS/15 :New pipe lines
for distribution system (Ranjhi).
JBP/WS/16 :Intake well,
approach bridge on Narmada river, tunnel, RWPS.
JBP/WS/17 :120 MLD Marmada
Water Treatment Plant.
JBP/WS/18 :Clear water
rising main and feeder mains.
JBP/WS/19 :Clear Water
Pumping station and Substation (120 mld).