GWL/WS/01 : Supply and
installation of bulk meters (strategic locations 19 Nos.) and (bulk
consumers 6 Nos.).
GWL/WS/02 :
Rehabilitation of WTPs (2 Nos.) & CWPS (2Nos.).
GWL/WS/03 : Leak Detection and repairs
(>250mm dia pipelines ) & 5000 connections pilot area.
-
Leak detection and
Repairs in Pilot Area (5000 connections) and all water lines
(AC/CI/PVC/GI/MS)
-
Leak detection and
Repairs for Transmission & Distribution system (all lines above 250
mm dia; AC/CI/MS)
-
Training of GMC & PIU staff in leakage detection and repairs
activities
GWL/WS/04 :
Distribution System: Lashkar (East & West) 80 mm(37.5 km), 100 mm(45
km), 150 mm(22.5 km), 200mm(22.5 km), 250mm(15 km) and 300mm(7.5 km) (PE
100/ DI).
GWL/WS/06 :
Distribution System: Gwalior and Morar 80 mm(20 km), 100 mm(24 km), 150
mm(12 km), 200mm(12 km), 250mm(8 km) and 300mm(4 km) (PE 100/ DI).
GWL/WS/05 :Phase II :
Consumer Meter: Non-domestic & domestic above 1/2".
GWL/WS/07 :
Rehabilitation of 600 mm dia CI Transmission Main from old WTP at
Motijheel to Amkho OH Reservoir.
GWL/WS/08 : Over Head
Service Reservoir, Lashkar East & West (5 nos., capacity 12 ML;Lot 1)
Gwalior and Morar (3 nos., capacity 8 ML;Lot 2).
GWL/WS/10 : Consumer
Meters
-
1,20,000 numbers ranging from ½” to 2”
-
Domestic consumers 1,00,000
-
Non-domestic and Industrial 20,000
GWL/WS/11 : New Water
Supply Scheme from Tighra Dam 45 MLD.
It includes:
Raw Water Pumping Station
45 MLD New Water
Treatment Plant
Clear Water Reservoir &
Pumping Station
Treatment Plant mainly
comprise of:
-
Aerator
-
Flash Mixers
-
Tube Settlers
-
Rapid Gravity Filters
GWL/WS/12 : Rising main
and feeder mains (4.2 km Raw Water Pumping Main, 800mm dia DI-K9 pipes
and 9.5 km Clear Water Pumping Main, 750mm dia).
|
4200 m, 800 mm dia DI K9 pipes |
 |
|
9500 m, 750 mm dia DI K9 pipes |